Projects carried out using the Norrapro® method
Heat pump plant Katri Vala, Helsinki
Heat pump plant Eiranranta, Helsinki
Laakso joint hospital, Helsinki
Defence forces
Boliden Kylylahti Oy mine
Sotkamo Silver Oy mine
Blominmäki Water treatment plant, Espoo
Länsimetro-Espoobay, Espoo
Länsimetro-Sammalvuori , Espoo
Länsimetro-Kaitaa, Espoo
Länsimetro-Kivenlahti, Espoo
Olkiluoto Nuclear Powerplant, Olkiluoto
Shopping center Redi, Helsinki
Year 2016 – on-going, shotcrete drainage system installed and other construction work performed
Rantatunneli -tunnel, Tampere, road tunnel
Years 2014–2016, > EUR 5.0 M, shotcrete drainage system installed and other construction work performed
Jokeri2, Road tunnel, Helsinki
Year 2014, > EUR 2.0 M, shotcrete drainage system installed and other construction work performed
Kivisydän Oulu, parking facility
Year 2013, shotcrete drainage system installed and the re-enforcement of shafts performed
Kehärata-Viinikkala, Vantaa, railway tunnels
Years 2011–2013, > EUR 1.0 M, shotcrete drainage system installed and other construction work performed
Upinniemi, Kirkkonummi, military base
Year 2012, EUR 0.2 M, shotcrete drainage system installed and other construction work performed
Länsimetro, Helsinki and Espoo, several locations, subway system from Helsinki to Espoo
Year 2010– on-going, >EUR 2.0 M, shotcrete drainage system installed and other construction work performed
Tapiola, Espoo, parking facility
Year 2012, > EUR 1.0 M, drainage system installed and other construction work performed
P-Hämppi, Tampere, parking facility
Years 2011–2012, > EUR 0.5 M, shotcrete drainage system installed and other construction work performed
Meilahti hospital, Helsinki, service tunnels
Years 2010–2012, > EUR 0.6 M, shotcrete drainage system installed and the re-enforcement of shafts performed
P-Töölö, Helsinki, parking facility
Year 2011, > EUR 0.4 M, shotcrete drainage system installed
Vesper, Helsinki, the underground facilities of the Parliament House
Year 2011, EUR 0.4 M, shotcrete drainage system installed and other construction work performed
Jämsä-Jyväskylä, railway tunnel
Year 2010, > EUR 0.2 M, shotcrete drainage system installed and other construction work performed
Rock Vallila, Helsinki, parking facility
Year 2008, > EUR 0.3 M, shotcrete drainage system installed and other construction work performed
Katri Vala, Helsinki, heat pump facility
Year 2008, EUR 0.2 M, shotcrete drainage system installed and other construction work performed
City Service tunnel, Helsinki
Year 2008, > EUR 0.7 M, shotcrete drainage system installed
SALES AND MARKETING:
Kai Saarikivi
Sales Director, BBA
tel. +358 504 699 290
kai.saarikivi(at)norrapro.fi
PRODUCTION AND DEVELOPMENT:
Petri Turunen
Business Development Manager, B. Eng
Tel. +358 400 166 260
petri.turunen(at)norrapro.fi
ADMINISTRATION:
Harri Väistö
CEO, MBA
tel. +358 400 922 094
harri.vaisto(at)norrapro.fi
Call us +358 504 699 290 or send us e-mail [email protected]